Description
Make: Deye 50kW HV Hybrid
Ac Output Data
Rated AC Output and UPS Power (W): 50000
Max. AC Output Power (W): 55000
AC Output Rated Current (A): 75.8/72.5
Max. AC Current (A): 83.3
Max. Continuous AC Passthrough (A): 150
Peak Power (off grid): 1.5 time of rated power, 10 S
Generator input/Smart load: 75.8/150/75.8
PV String Input Data
Max. DC Input Power (W): 6500
Max. DC Input Voltage (V):1000
Start-up Voltage (V): 180
MPPT Range (V): 150~850
Full Load DC Voltage Range (V): 450~850
Rated DC Input Voltage (V): 600
Spec Sheet: Deye-50KW-Three-Phase-Hybrid-Inverter-Brochure
Solar Array
Rated Maximum Power: 620w
Open Circuit Voltage: 48.50
Maximum power Voltage: 40.21
Short circuit: 16.13
Maximum Power Current: 15.42
Module efficiency: 23.0
Power Tolerance: 0~+3%
Number of Units: 80
Total PV Capacity : 49.6KW
Expected daily generarion @ 5.5Hrs : 272.8kW
Data Sheet: Datasheet_-_Ja_Solar_JAM72D40_575-600_LB_(EN)_(2)[1]
Make: Volta Cube 70KWh
Nominal Energy: 71KwH
Nominal Voltage: 716.8
Nominal Capacity:100AH
Cell Type: LFP
Standard Charge Voltage: 806.4V
Max Charge Current: 100A
Discharge Cut-Off Voltage:645V
Spec Sheet : Gwstore Volta Cube
Warranty
- 10 Year Warranty
Balance of System
1 x Keto 125Amp Battery Disconnect Fuse Breaker
1 x AC Protection Box – Surge Arrestor – 2 x 150Amp Breakers – Changeover
2 x 25mm x 2m Battery Cable
1 x 6 String DC Input Protection Box
1 x AC Protection Box – Surge Arrestor – 2 x 150Amp Breakers – Changeover
2 x 35mm x 5m Battery Cable
Full Installation Notes
- Installation offering for JHB, Port Elizabeth, Alexandria, Cape Town, Pretoria, Pongola, Durban and within 100kms of those main centers.
- Installation by fully certified HV technicians.
- No extreme angle roof types (>30 degrees) and no slate roof types that may require slate kits.
- Extra will have to be charged if panel lifts are required or ladder rental for very high roofs.
- Offer assumes that installation point is within 20M from mains db board.
- Mains DB must have an existing Certificate of Compliance, extra will have to be charged if a COC needs to be done.





