Sunsynk Kit Special – Sunsynk 5kw – Sunsynk 10.65kw Battery – ( Equipment only)

R57,114.75

Brand: Sunsynk
1 x Sunsynk 5kw
1 x Sunsynk 10.65kw Battery

 

Out of stock

Description

Make: Sunsynk 5kW

Ac Output Data
Rated AC Output: 5000W
Max. AC Power: 5500W
Peak Power (off-grid): 2 times of rated power, 10 S
AC Output Rated Current: 21.7A
Max AC Output Current: 25A
Max Continuous AC Passthrough: 35A
Power Factor: 0.8 leading to 0.8 lagging
Output Frequency and Voltage: 50/60Hz; 220/230
Grid Type: Single Phase
Current Harmonic Distortion: THD<3% (Linear load<1.5%)

Pv String Input Data
Max. DC Input Power: 6500W
PV Input Voltage: 370V (100V~500V)
MPPT Range: 125~425V
Full Load DC Voltage Range: 240~425V
Start-up Voltage: 150V
PV Input Current: 11A+11A
No. of MPPT Trackers: 2
No. of Strings Per MPPT Tracker: 1+1

Battery Input Data
Battery Type: Lead-acid or Lithium-ion
Battery Voltage Range: 40~60V
Max. Charging Current: 120A
Max. Discharging Current: 120A
Charging Curve: 3 Stages/Equalisation
External Temperature Sensor: Optional
Charging Strategy for Li-Ion Battery: Self-Adaptation to BMS

Spec Sheet:SUN-5-datasheet_220818_194854 (1)

Key features:

  • Easy and simple to understand display
  • Supporting Wi-Fi or GSM monitoring
  • Visual power flow screen
  • Smart settable 3-stage MPPT charging for optimized battery performance
  • Auxiliary load function
  • Parallel / multi invert function grid-tied and off-grid

Make: Sunsynk 10.65kWh Lithium

Nominal Voltage: 51.2 Vdc
Battery Energy: 10650 Wh
Charge Voltage: 55.68~56.16 Vdc
Discharge Voltage: 45.6-56.16 Vdc
Max Charge / Discharge Current: 200A
Max Charge / Discharge Power: 10000W
Short Circuit Current: 540A
Nominal Capacity: 208Ah
Nominal Charge/Discharge Current: 100A
Nominal Charge/Discharge Power: 200A

Spec Sheet:SUN-BATT-1065-datasheet_220818_194854 (1)

Full Installation Notes

  • Installation offering for JHB, Port Elizabeth, Alexandria, Cape Town, Pretoria, Durban, Pietermaritzburg and within 100kms of those main centers.
  • Offer assumes that installation point is within 10M from mains db board.
  • Mains DB must have an existing Certificate of Compliance, extra will have to be charged if a COC needs to be done.

 

 

 

You may also like…