Sunsynk 100kW HV – Sunsynk 160kWh Battery – 99kWp JA Solar – Fully Installed

R1,918,362.35

The Sunsynk 100kW kit is a fully fledged solar kit, complete on both the AC and DC side.

This kit has the following performance properties:

Inverter Capacity: 100kW 3 Phase

Battery Capacity: 160kWh

Remote Communications: Yes, if wifi available at install point

Description

Model:  Sunsynk 50kW Hybrid

Number of Units: 2

Rated Power: 100kW

Type: True Hybrid

Input Voltage: 3L/N/PE 220/380, 230/400Vac

Phase: 3 Phase

Frequency: 50/60 Hz

Spec Sheet: Sunsynk_ThreePhaseHI_25_50K_Datasheet_v6_English

Battery Storage

Battery Type: Sunsynk 80kWh HV

Number of Units: 2

Total Storage: 160kWh

Module Nominal Voltage: 665.6V

Operating Temperature Range: -20 °C ~ 60 °C*

Cycle Life: Warranted 10 years

Spec Sheet: Sunsynk 80kWh HV Spec

Solar Array

Panel Type: Canadian Solar 555wp

*NOTE: Panel brand is interchangeable with Longi Solar/Jinko Solar or JA Solar

Number of Units: 180

Total Capacity: 99kWp

Estimated Generation @ 5.5hrs: 544.5kWh per day

Mounting System: IBR/Zinc or Standing Seam type roof

Cycle Life: Warranted 25 years

Spec Sheet: Canadian Solar 555wp – Datasheet CS6W

Balance of System

2 x Keto 125Amp Battery Disconnect Fuse Breaker

1 x AC Protection Box – Surge Arrestor – 2 x 250Amp Breakers – Changeover

4 x 25mm x 2m Battery Cable

2 x 6 String DC Input Protection Box

1 x 250A Grid Isolator 1 input, 1 output for 250A Systems

1 x Three Phase AC Protection Box 1-In 1-Out 250A Type II SPD

1 x 1 input 1 output Double Disconnect Board for 250A Systems

Full Installation Notes

  • Installation offering for JHB, Port Elizabeth, Alexandria, Cape Town, Pretoria, Pongola, Pietermaritzburg and within 100kms of those main centers.
  • Installation by fully certified HV technicians.
  • No extreme angle roof types (>30 degrees) and no slate roof types that may require slate kits.
  • Extra will have to be charged if panel lifts are required or ladder rental for very high roofs.
  • Offer assumes that installation point is within 20M from mains db board.
  • Mains DB must have an existing Certificate of Compliance, extra will have to be charged if a COC needs to be done.